Electrical Infrastructure Project 1
Client:
Location:
Value:
Description
Electrical Balance of Plant for the Entire Mount Eagle 12 MW Turbine windfrarm. This project is connected to the existing grid at the Coolaboola 110/20kV substation via 12km underground 20kV cable.
Project Scope
Powercomm designed built, commissioned & maintain this entire facility from an MV/HV perspective. We also acted as PSCS for the project and managed the civils aspect liasing with ESB Networks, client developer and principal supply procurement and Eirgrid in terms of all functional specifications, predictive analysis and operational modelling as well as:
-
6 No. 20 kV Siemens NxPlusC Switchboards
-
20kV collector circuit ncabling
-
High Voltage system controls, protection, metering, annunciation (Remote panels) & battery systems
-
Site wide Fibre Optic Cabling system
-
Full commissioning of each substation including High Voltage cable circuits and VLF testing
Electrical Infrastructure Project 2
Client:
Location:
Value:
Description
Electrical Balance of Plant for the Entire Mount Eagle 12 MW Turbine windfrarm. This project is connected to the existing grid at the Coolaboola 110/20kV substation via 12km underground 20kV cable.
Project Scope
Powercomm designed built, commissioned & maintain this entire facility from an MV/HV perspective. We also acted as PSCS for the project and managed the civils aspect liasing with ESB Networks, client developer and principal supply procurement and Eirgrid in terms of all functional specifications, predictive analysis and operational modelling as well as:
-
6 No. 20 kV Siemens NxPlusC Switchboards
-
20kV collector circuit ncabling
-
High Voltage system controls, protection, metering, annunciation (Remote panels) & battery systems
-
Site wide Fibre Optic Cabling system
-
Full commissioning of each substation including High Voltage cable circuits and VLF testing
Electrical Infrastructure Project 3
Client:
Location:
Value:
Description
Electrical Balance of Plant for the Entire Mount Eagle 12 MW Turbine windfrarm. This project is connected to the existing grid at the Coolaboola 110/20kV substation via 12km underground 20kV cable.
Project Scope
Powercomm designed built, commissioned & maintain this entire facility from an MV/HV perspective. We also acted as PSCS for the project and managed the civils aspect liasing with ESB Networks, client developer and principal supply procurement and Eirgrid in terms of all functional specifications, predictive analysis and operational modelling as well as:
-
6 No. 20 kV Siemens NxPlusC Switchboards
-
20kV collector circuit ncabling
-
High Voltage system controls, protection, metering, annunciation (Remote panels) & battery systems
-
Site wide Fibre Optic Cabling system
-
Full commissioning of each substation including High Voltage cable circuits and VLF testing