EPC Contract connecting 5x3.45MW turbines to Ardnagappary 110/38kV substation via ESB/IPP substation and a 4.6kM 630 mm2 solid core aluminium cable connection.

Overlooking shot of Keeldrum Windfarm 2 Donegal and a Powercomm car also in view on the bottom right of image

Project information

Client: Jennings O'Donovan
Location: Donegal, Ireland
Project name: Keeldrum/Cronalaght 2 Wind Farm,
Project timeline: -
Project value: 2M
Project tags: Commissioning / Renewables

Summary:

EPC Contract connecting 5x3.45MW turbines to Ardnagappary 110/38kV substation via ESB/IPP substation and a 4.6kM 630 mm2 solid core aluminium cable connection.

Scope Overview:

Complete Electrical Turnkey Project - Design, Procurement, Installation, Commissioning

ESB 38 kV Substation – 

  • Civil design and construction of building and compound,
  • Electrical design and installation including ESB AIS equipment and SF6 circuit breaker,
  • Pre-commissioning of ESB Station

IPP 20kV Substation –

  • Civil design and construction of building and compound,
  • Electrical design and install of ESB AIS equipment,
  • Commissioning of ESB Station

Ancillary equipment –

  • Fire/Intruder Alarms,
  • RECI certifications,
  • Emergency Lighting

38kV Grid Cable – 

  • Installation,  
  • Cable jointing, Straight through and screen extension joints
  • Testing