BESS 2
Aghada, CorkThe Aghada BESS 2 Project comprised of the Design and Build of a 159MW Battery Energy Storage Solution
The Aghada BESS 2 Project comprised of the Design and Build of a 159MW Battery Energy Storage Solution
The Clogheravaddy Substation was built to facilitate connection of 22 MW of wind generation, connected to Binbane 110 kV substation in Donegal
This project involved transferring data centre supply from the network utility to a modern designed switchgear arrangement
EPC Contract connecting 5x3.45MW turbines to Ardnagappary 110/38kV substation via ESB/IPP substation and a 4.6kM 630 mm2 solid core aluminium cable connection.
EPC Contract connecting 6 x2.3MW turbines to Glenree 110 kV Susbstation via ESB/IPP substation
The Altamuskin 33kV Substation was built on behalf of Energia
EirGrid planned the new Kilpaddoge substation in parallel with three other transmission substations in the south west region.
Ireland’s first contestably built 38kV AIS loop substation and 20kV Independent Power Producer (IPP) electrical substation
EirGrid planned the new Ballinahulla substation in parallel with three other transmission substations in the south west region.