Graeme PoyntzESBOur experience with Powercomm has been exceptional, thanks to their highly experienced team that consistently delivers HV maintenance and responds promptly to short notice callouts. Their expertise and dedication have been instrumental important in ensuring the reliability and efficiency of some of our electrical assets. Powercomm's team is capable of handling complex emergencies, providing us with the confidence that our wind portfolio with them is in capable hands. Their commitment to quality is evident in every project they undertake, making them a trusted partner for ESB.
Conor McConvilleABO EnergyI have worked with Powercomm Group on various projects over the past five years. One of the best things about working with them is their accommodating and flexible approach, even when requests fall outside the agreed scope of work. For example, we needed locks installed on wind turbines—although this wasn’t a service Powercomm typically provides, they quickly found an effective solution for us. Their team is easy to communicate with and highly efficient. I would highly recommend Powercomm Group and look forward to continuing our partnership in the future.
Nickey Mulvihill Aughinish AluminaThere are a number of reasons why we continue to work with Powercomm on our HV and MV installs.
The quality of workmanship is exceptional. If there is a field issue, it is brought to our attention and rectified. One example would be where there was a manufacturing defect in a new drum of MV cable. Powercomm brought this to our attention, and we were able to replace the cable and ensure there was no risk of failure at a later date. Also we have never had an issue or a failure on a cable termination done by Powercomm.
In terms of protection systems the knowledge and skill level is again exceptional. Protection system settings implemented by Powercomm have proven correct under fault conditions without any discrimination issues.
Powercomm upgraded the main 22KV switchgear for the plant, while at all times maintaining the plant load. There was no safety incidents over the two year duration of the project. Powercomm recently upgraded the station batteries, again maintaining the supply at all times. Powercomm have also provided emergency support to the plant.
Overall we have a very good relationship with Powercomm and have a lot of trust in the guys that come to site, in particular Shane Golden & Mark Denissen.